Capacity

Capacity planning for your teamsbefore you promise a date

Accepting an engagement without knowing who will deliver it means overtime and missed deadlines ahead. Numezis shows each person’s load week after week, leave and activity rate included, flags overloads and proposes how to rebalance the team.

  • Approved leave built in
  • Activity rate respected
  • Overloads flagged

An overload spotted three weeks ahead

Studio Lago SA is planning its design team for weeks 45 to 48 of 2026. Giulia Rossi is planned at 125 % in week 47: 50 hours for 40 available, because of two simultaneous deadlines. Chloé Favre is on approved leave in weeks 46 and 47. The agent proposes handing 8 hours of mock-ups to Luca Brunner, who is still at 60 % of his availability.

  • Each person’s availability takes into account their activity rate, cantonal public holidays and approved leave.
  • Planned load comes from project assignments, spread across weeks according to phases and deadlines.
  • Cells turn amber from 90 % and red beyond 100 %, so an overload is visible at a glance.
  • The agent proposes a concrete rebalancing, without changing any assignment until the team lead has accepted it.
Numezis · Projects · Capacity

Design team · weeks 45 to 48

Studio Lago SA · planned load against availability

1 overload
PersonW45W46W47W48Giulia Rossi · 100 %85 %95 %125 %70 %Noah Keller · 80 %60 %75 %80 %90 %Chloé Favre · 100 %100 %LeaveLeave65 %Luca Brunner · 60 %40 %55 %60 %50 %
Overload above 100 %Full load 90 to 100 %Approved leave
Overload detected

Giulia Rossi is planned at 125 % in week 47: 50 h for 40 h available.

Agent proposal: hand 8 h of mock-ups to Luca Brunner, without touching the 27.11.2026 deadline.

Load grid of four people over four weeks, with a 125 % overload flagged, approved leave and the agent’s rebalancing proposal.

Swiss controls

Planning that respects people

Planning means committing the time of employees who have a contract, holidays and legal limits. Numezis applies these rules to every assignment, for a realistic load and deadlines that hold.

  • Approved leave, capacity removed

    Leave approved in the HR module automatically reduces availability for the week concerned. An assignment during a leave period is refused or flagged, according to your rule.

    Automatic
  • Activity rate applied to availability

    A person working 80 % has 80 % of the company’s weekly working time. Their load is measured against this contractual time, not against full time.

    Automatic
  • Overload beyond 100 % flagged

    As soon as a week exceeds availability, the person and their team lead are flagged. Overtime remains governed by CO art. 321c and the Labour Act.

    Flagged
  • Maximum working time monitored

    Planning that would exceed the maximum weekly working time of 45 or 50 hours set by Labour Act art. 9 is blocked or requires explicit approval from management.

    Blocked
  • Reassignment proposed, never imposed

    The agent can propose moving hours from one person to another, but the assignment only changes once the team or project lead has accepted it.

    Approval required
  • Cantonal public holidays taken into account

    Each employee’s calendar follows the public holidays of their working canton, such as Ascension, the Federal Fast or Saint Joseph’s Day depending on the canton.

    Automatic

Plan the team with real numbers

Resource planning is only reliable if it knows contracts, absences and projects. Numezis brings this data together for an accurate view of the team’s capacity.

People × weeks grid

A readable grid shows each person and each week with their load as a percentage, leave and overloads, filterable by team, skill, site or project.

Project assignments

Assign a person to a project in hours per week or as a percentage, for a given period; the load is spread automatically and updates with every change.

Real availability

Contractual time, activity rate, approved leave, cantonal public holidays and known absences are deducted automatically, for an availability that matches each person’s reality.

Overload alerts

A future overload triggers an alert to the team lead with the week, the person and the projects involved, before the situation becomes urgent.

Simulating a new engagement

Before signing, simulate the load of a new project on the team: you see immediately which weeks become critical and which delivery date is realistic.

Planned versus actual

Compare planned load with logged hours for each person and each project, and improve your estimates from one engagement to the next.

Utilisation rate

Track utilisation and billable rate per person and per team, to spot both chronic overload and spare capacity you could sell.

Rebalancing by the agent

The agent spots overloads, looks for an available person with the right skill and proposes a costed move of hours, which you accept in one tap.

Planning by skill

Each employee carries their skills and languages. Planning shows available capacity by skill, which tells you whether you can accept a specialised engagement.

The guide

Guide: capacity planning in a Swiss SME

Capacity planning means comparing upcoming work with each person’s truly available time. In a Swiss SME that sells projects, it protects the teams, the deadlines promised to clients and the profitability of engagements all at once.

What is capacity planning?

Capacity planning, also called resource planning, answers two questions: who is working on what in the coming weeks, and does the team have enough time for everything that has been promised? It sets the load, coming from signed and likely projects, against capacity, coming from employment contracts.

For an agency, an engineering office, a consultancy or a fiduciary, it is the tool that avoids two costly mistakes: accepting an engagement nobody has time to deliver, and leaving some employees underused while others pile up overtime. Good planning is done by the week, over a horizon of one to three months, and is updated as soon as a project, an absence or a priority changes.

How do you calculate a team’s real capacity?

Real capacity starts from contractual time: for example 42 hours a week in the company, multiplied by each person’s activity rate. An employee working 80 % therefore has about 33.6 hours. You then remove approved leave, public holidays in the working canton, training and known absences.

You also need to reserve time for non-billable work: internal meetings, administration, pre-sales. Depending on the trade, 15 to 30 % of time cannot be planned on client projects. Remember that holiday entitlement is five weeks until age 20 and then at least four weeks under CO art. 329a. Numezis calculates this availability automatically from HR data, so planning rests on the time really available and not on a theoretical full time.

How do you prevent employee overload?

Overload rarely shows up in a single project plan: each project manager plans reasonably, but the same person is called on by three projects at once. Only a consolidated view per person and per week reveals the problem.

The Labour Act limits maximum weekly working time to 45 hours for most office and service employees (art. 9), and overtime must remain exceptional and be compensated or paid under CO art. 321c. To prevent overload, set an alert threshold, for example 90 %, review planning every week and arbitrate priorities between projects rather than stacking them. Numezis flags every future overload and the agent proposes a reassignment to an available person with the right skill.

How do you plan a new project before signing it?

Before committing to a delivery date, simulate the project’s load on the team. Estimate the hours per profile and per phase, place them in the calendar and look at which weeks become critical. If the team is already at 95 % over the period, you will need to push back the start, subcontract part of the work or give up another priority.

This simulation also provides a commercial argument: a realistic date that is met is worth more than an ambitious date that is missed. Opportunities in the sales pipeline can be taken into account with a probability, to anticipate hiring needs. In Numezis, a project in preparation can be planned without being confirmed, and the assignment becomes effective when the opportunity is won.

Resource planning: spreadsheet or software?

A planning spreadsheet works as long as a single person keeps it up to date and the team is small. It quickly becomes wrong: leave recorded elsewhere, activity rates forgotten, projects added without an update, and no comparison with the time actually logged.

Capacity planning software connected to HR and projects solves these problems. Approved leave reduces availability automatically, assignments come from projects, and logged time lets you compare planned and actual. Planning in turn feeds each project’s estimate at completion. For a Swiss SME, check the handling of cantonal public holidays, part-time work and data hosting in Switzerland: Numezis brings these elements together in one system.

Frequently asked questions about capacity planning

The questions team leads and management ask before planning their resources in Numezis.

Does planning take part-time work into account?

Yes. Each employee’s activity rate, defined in their HR record, determines their weekly availability. A person working 60 % over three days a week has their capacity calculated on those days, and any assignment beyond it is flagged as an overload.

Is leave picked up automatically?

Yes. Leave approved in the HR module immediately reduces availability for the period. Requests still pending can be shown separately, to anticipate them without counting them as granted. Public holidays follow each person’s working canton.

Can we plan in hours or as a percentage?

Both. An assignment can be expressed in hours per week, as a percentage of availability or as a total volume of hours spread over a period. The grid always shows load as a percentage so people with different activity rates can be compared.

Does the agent change the plan on its own?

No. The agent detects overloads and proposes costed reassignments, but no assignment changes without the agreement of the team or project lead. Every proposal, accepted or declined, stays traced in the project history.

Can sales opportunities be included in planning?

Yes. A CRM opportunity can carry a forecast load weighted by its probability. You then see the likely load for the coming months and can anticipate hiring or subcontracting. When the opportunity is won, the project and its assignments become effective.

Can employees see their own schedule?

Yes. Each employee sees their assignments for the coming weeks in their personal space, with the projects and planned hours. They can report unavailability or a risk of overload, which alerts their team lead before the problem settles in.

Plan your teams on reliable numbers

Import your team, connect leave and projects, and see in a few minutes who is overloaded in the coming weeks.